Village of Maxwell Water Storage Tank Replacement

Construction of approximately 12,100LF of 6, 8 and 14-inch C-900 PVC pipe, 560 LF of 6, 8 and 14″ directional drilled HDPE DR 11 HDPE, isolation valves, hydrants, meter coil pits, and other appurtenances, trench groundwater dewatering, rock excavation, lien fill encasement, asphalt patching, concrete curb and sidewalk replacement.

Project navigation

PreviousPrevious project:2015 Colonias Water Tank- BayardNextNext project:Mescalero Apache Tribe Community Water Improvements

FILE CONSTRUCTION, LLC © 2025 All Rights Reserved | LIC:379720 | 109 Industrial Ave NE, Albuquerque, NM 87107 | 505-554-1780 | fconstadmin@fconst.com

Go to Top